Environmental Monitoring

We work directly with the company, construction personnel and regulators to ensure that the project is completed to everyone’s satisfaction.  From preparation of the Environmental Protection Plan, to its successful implementation Eco-Web is there to support our clients every step of the way.  We are not afraid to dig in and try out new and innovative mitigation strategies and have the research background to be able to document their effectiveness. 

Wildlife Monitoring

  • Monitoring during key timing windows for birds or species at risk
  • Wildlife Monitoring for Mitigation Plans
  • Bear Den Investigations and Avoidance
  • Breeding Bird Nesting Monitoring

Aquatic Monitoring

  • Supervision and Design of In-Stream Works
  • Bridges and culverts (new or upgraded structures)
  • Decommissioning or removal of stream crossing structures
  • Installation of Water Withdrawal Systems
  • HDD Turbidity Monitoring

Reclamation Monitoring

  • Topsoil Stripping Monitoring
  • Monitoring Interim Construction and Reclamation
  • Supervision of Final Reclamation
  • Reclamation Follow Up Inspections

Environmental Monitoring of Construction Projects

  • Environmental Monitoring of Stream Crossings
  • Contractor Construction Environmental Monitoring
  • EPP/EMP Compliance Environmental Monitoring

Environmental Inspection of Pipeline Projects

  • Environmental Protection Plan Creation
  • Project Management of Pipeline Programs
  • Pipeline Bore Incident Contingency Planning
  • Watercourse Crossing Monitoring

CASE STUDY

TALISMAN ENERGY – WILLISTON WATER PIPELINE, HUDSON’S HOPE, BC. ENVIRONMENTAL INSPECTION OF  PIPELINE CONSTRUCTION

Eco-Web completed the background environmental work assessments including scouting, stream surveys, wildlife surveys, bird surveys and prepared an Environmental Protection Plan for the construction of this 28 km water line from Williston Lake to Talisman’s operations in Altares.  Eco-Web provided the Environmental Inspector and Turbidity monitors for the construction phase of the project.

SPECTRA ENERGY TRANSMISSION – CONNECTOR PIPELING – WONOWON, BC. ENVIRONMENTAL INSPECTION

Eco-Web provided pre-project planning and environmental services centered on the Environmental Inspection of this NEB Regulated line in northeastern BC.  Project duties included ensuring the Environmental Protection Plan was followed by the contractor, monitoring the horizontal directional drills, monitoring wildlife along the right of way with the assistance of representatives from the Blueberry River First Nation, waste management and reclamation of the right of way.  Eco-Web worked with the inspection team and Spectra’s engineers to ensure a successful completion of the project. One example of a successful biodiversity enhancement project on this job was the relocation of a red tailed hawk nest (currently has a mating pair in it after being relocated).